Client: BG Egypt
Location: Offshore Egypt

BG and their partners experienced issues with increased liquid production in their WDDM development off the Egyptian coast.

The problems compounded by the depth of the wells, with the deepest some 1,000m below sea level, and also the high liquid production rates anticipated in the future.

Scope

  • Flow assurance
  • EIA
  • Mechanical design.

Features

  • FEED systems engineering
  • Pipeline mechanical design
  • Installation analysis
  • Fibre optic cable design
  • Interface management
  • Investigating specific operating issues. For instance, in some extreme cases the operator vented hydrocarbons to sea as they could not get the wells started due to an excessive build-up of liquids.